HORIZONTAL SOUNDING: a number of measurements needs to be completed by transferring alongside a straight line; the road fashioned from the four electrodes getting both parallel or perpendicular on the axis of this progression.Figuring out at what depth probably the most conductive soil is found for the site enables the look engineer to product a pr